Command - Prb_ProjectSettings

               

Whenever Parabuild generates a new 2D sheet, it will insert a title block into it.

The text that should be inserted in the fields of these title blocks can be entered in this dialog box.

The 2D sheets will always guard the project data. So changing the project data in this dialog box will not automatically update the text fields in all the 2D sheets.
To update the project data in 2D sheets, right-click on the sheet to Change Scale / Format / Project data. See the Right-click on a 2D Sheet topic for more information about this.


More about the project data fields in this dialog box

In this dialog box the first 15 fields are fixed and always there, no matter what the title blocks contain.

These 15 fields are used not only for filling title blocks in sheets, but also for writing project data to KISS format files for example.

These 15 fields will work across all languages. If you would change the Parabuild language then the field values will stay intact.

In the below image, the fixed fields are indicated in red.

When using these fields in a title block, it is possible to use the text "Project Name" or "Project_Name". Both texts will be replaced by the actual project name.

The dynamic fields are indicated in green. These fields can be entered freely inside title blocks.

More dynamic fields can be added by simply typing them in a title block, and saving the dwg file.

When you open the Project data dialog box, all of the title blocks that start with the current language (English*.dwg) will be loaded and all text fields are analyzed. The non-standard fields are then added to the list of fields.